Project charter & SIPOC
Scope, sponsor, process inputs, outputs and customer
Your Lean Six Sigma project, prepared one decision at a time.
All names, results, evidence references and reviews are fictional. The calculator and Pareto retain the 80-defect baseline; the pilot records 16 defects (4,000 DPMO). All five phases are reviewed within this example. Evidence references describe this scenario; no real study files or signatures are attached.
Reference completeness: All preparation worksheets and applicable registers are populated, including 10 stakeholders and 12 assigned RACI activities. Review the documented method limitations; future audits remain planned.
Choose the depth of guidance for this project.
One connected project workspace. Select a phase or tool; your measurements, registers and project decisions stay linked as you work.
These checks flag data completeness and consistency only; a qualified reviewer must still evaluate technical evidence.
Documentation coverage is a planning indicator, not evidence verification or tollgate approval.
Green Belt essentials first. Black Belt study worksheets remain available when that pathway is selected.
Scope, sponsor, process inputs, outputs and customer
Translate needs into measurable requirements
Influence, RACI, communication and ownership
Methods and phase selections follow the supplied ASQ Green Belt (3rd ed.) and Black Belt (4th ed.) handbooks. SigmaPath is an independent tool, not an ASQ product. Automated visuals support practitioner judgment; they do not establish causal proof or certify process capability.
Explore the fabricated but reconciled daily records behind this DMAIC case. Comparisons are descriptive, and scenario IDs do not represent physical audit evidence.
80 defects / 1,000 orders
76 affected orders · check sheet reconciled
16 defects / 1,000 orders
16 affected orders · check sheet reconciled
80 defects / 5,000 orders
79 affected orders · check sheet reconciled
Comparable 4-CTQ definitions across all three sample windows.
25 groups of 200 orders; daily UCL ≈ 8.57 defects (Poisson u reference), not a target.
Baseline vs pilot (75.7% lower modeled mean). Sustained daily mean: 58.12 min. Current and future VSM remain separately editable.
AED 5,120 gross allowance less AED 480/month support; one-time AED 5,500. Forecast only—no cash-released or finance-audited savings.
All study references are fictional; source records, real sign-offs and statistical audit files have not been attached.
Download the selected project as an A4 or A3 PDF. Landscape is recommended for charts and diagrams.
PDF is for reading and printing. Use a data archive to restore editable projects on another browser.